SCENARIO · 05

智能标书 / 智能合同AI tender writing / AI contracts

从「要不要投」到「投得对不对」。下面用 40 秒看完一遍完整流程。From “should we bid?” to “did we get it right?” — the full flow in 40 seconds.

01 / 07开场Opening妙悟OntoThink · 入库Ingest
招标文件Tender doc
技术附件Annexes
评分办法Scoring rules
答疑纪要Q&A memo
合同条款Contract terms
补充说明Clarifications
0
页 · 6 个附件pages · 6 annexes
格式合规Format✓
加密 / 损坏Encryption / damage✓
完整度Completeness⚠
可识别性Legibility⚠
招标相关Tender relevance⚠
大小 / 数量Size / count✕
换掉错误文件 → 6 项通过,进入解析Swap the bad file → 6 passed, parsing starts
文件结构识别Detect structure
0%
关键章节定位Locate sections
0%
资质要求解析Parse requirements
0%
评分 / 废标 / 加分项Scoring / reject / bonus
0%
报价与合同规则Pricing & contract rules
0%
知识库匹配比对Match knowledge base
0%
招标方Buyer1
包号Lot no.3
资质要求Qual reqs8
评分项Scoring items37
废标条款Rejection clauses6
★ 条款★ Clauses18
6 / 6 完成 · 自动进入评估,不用点下一步6 / 6 done · moves to assessment on its own
风险项Risks
0
致命Fatal
2
高High
3
中Medium
资质匹配Qual match
满足Met
21
部分满足Partial
4
缺失 / 需人工Missing / manual
5
红牌Red flag放弃建议书Drop the bid
熔断Circuit break内部纠偏报告Internal correction memo
可投Bid进入标书制作Move to drafting
置信度 82% · 依据 → 影响 → 建议,判定权在人Confidence 82% · evidence → impact → advice; humans decide
三级目录 · 招标文件提取3-level outline · extracted from tender
一、商务部分1. Commercial
1.1 投标函1.1 Bid letter
1.2 资质文件1.2 Credentials
二、技术方案2. Technical proposal
2.1 系统架构2.1 Architecture
2.2 交付计划2.2 Delivery plan
三、服务承诺3. Service commitments
3.1 服务响应3.1 Service response
★ 条款★ Clauses已挂接Linked
资质门槛Qual thresholds已挂接Linked
评分项Scoring items已挂接Linked
废标条款Rejection clauses已挂接Linked
响应覆盖率Response coverage
0%· 缺口 7 项· 7 gaps
投标文件 · 技术方案Bid document · Technical proposal
我方承诺按招标文件要求完成全部工作内容……We commit to the full scope set out in the tender…
本项目工期承诺为 180 日历天,确保按期交付。Project duration committed at 180 calendar days.
投标人已取得系统集成一级资质,附证书复印件。Bidder holds System Integration Tier 1; certificate attached.
授权书仅覆盖第一包号,未涉及本次投标包号。Authorization covers lot 1 only, not this lot.
第 214 行Line 214
工期 180 天 > 要求 ≤150 天Duration 180d > required ≤150d
第 87 条Clause 87
授权书未覆盖本包号Authorization excludes this lot
两处偏差已定位 · 其余 212 项通过2 deviations located · 212 other items pass
妙悟OntoThink
海量信息,高质量生成Massive input, high-quality output
妙悟OntoThink记忆层Memory知识层Knowledge数据层Data本体层Ontology已入库 0 条0 entries indexed
一份标书,先要读懂两百多页A tender starts with 200+ pages to read
0s
现在怎么干How it works today

上百页招标文件人工通读 2–4 小时;投不投靠经验拍板,投错标成本收不回;一份标书要编 3–5 个工作日,素材散在个人电脑里;漏检靠人眼,废标风险后置到开标才知道。Reading hundreds of pages by hand takes hours; bid/no-bid is a gut call and a wrong bid is expensive; a tender takes 3–5 working days while materials sit on personal drives; missed clauses are only caught at bid opening.

用了之后With OntoThink

解析 10 分钟出结构化结果,人只做确认;四条硬规则在报价前拦下明显不匹配的项目;章节框架由招标要求自动生成,编写变成“填素材 + 改表述”;偏差能定位到原文位置,一致性问题 10 分钟内查完。Structured results in 10 minutes, with humans confirming; four hard rules stop obvious mismatches before pricing; the outline is generated from the tender's own requirements, so writing becomes filling materials and refining wording; deviations point to the exact line, so consistency checks finish in minutes.

画面中的文件、数字与流程均为示意,结果需专业人员复核。Documents, numbers and workflows shown are illustrative; results require professional review.